Issuance of Other Building Permits

Aside from a Building Permit, the Office of the Municipal Engineer issues other permits that are required before the renovation, construction or demolition of any structure. These are the issuances of electrical Permit, Mechanical permit, sanitary/Plumbing permit, fencing permit, demolition permit, permit for temporary service connection, excavation and ground permit, sidewalk construction permit and signage permit.

Office or Division:

Office of the Municipal Engineer

Classification:

Complex

Type of Transaction:

G2C

Who may avail:

All

CHECKLIST OF REQUIREMENTS

WHERE TO SECURE

1.    Electrical Permit

1.1   Electrical Permit application Form signed

1.2   Electrical permit Application 

Form signed by a professional electrical engineer or its equivalent for Bungalow type building.

1.3  Electrical Plans

1.4  Electrical Specifications

1.5  Bill of Materials and Cost

       Estimates

1.6  Fire Clearances

1.7  Permit fee

1.8 Latest Certificate of Tax

      Payment

 

–       Office of the Municipal Engineer

 

–       Owner/ Client

 

 

 

–       Owner/ Client

–       Owner/ Client

–       Owner/Client

 

–       Office of Bureau of Fire and Protection

–       Treasury Office

–       Treasury Office

2.    Mechanical Permit

           2.1 Application Form signed by a

                 professional Mechanical             

                 Engineer or its Equivalent.

2.2 Mechanical Plans

2.3 Mechanical Specifications

2.4 Bill of Materials and Cost

      Estimates

2.5 Permit Fee

2.6 Latest Certificate of Tax 

       Payment

 

–       Office of the Municipal Engineer

 

 

–       Owner/Client

–       Owner/Client

–       Owner/ Client

 

–       Treasury Office

 

–       Treasury Office

      3. Sanitary Plumbing Permit

3.1 Sanitary/Plumbing Application Form signed by a Sanitary Engineer or Master Plumber

3.2 Sanitary Plumbing Plans

3.3 Sanitary/Plumbing    

      Specifications

           3.4 Bill of Materials and Cost

      Estimates

3.5 Permit Fee

3.6 Certificate of Tax Payment

      (update)

 

 

–       Engineering Office

 

 

–       Owner/Client

–       Owner/ Client

 

–       Owner/ Client

 

–       Treasury Office

 

–       Treasury Office

       4. Fencing Permit

 4.1 Accomplishment Fencing

         Permit Application Form

 4.2 Fencing Plan Bill of Materials 

       and Cost Estimates

 4.3 Lot Plan with Certification of   

       Geodetic Engineer that the    

       proposed fence will not  

       encroach on adjoining

       properties

           4.4 Title of Property (TCT) or    

                  Tax Declaration

4.6 Deed of Sale/Lease 

      Contract/Contract to sell (if

      the TCT is not in the name of

      the owner/applicant)

4.7 Updated Tax Declaration and

      Certificate of Real Property

      Tax Payment

4.8 Permit Fee

 

 

–       Engineering Office

 

–       Owner/ Client

 

–       Owner/Client

 

 

 

 

–       Office of the Assessor

 

–       Owner/ Client

 

 

 

–       Office of the Assessor

 

 

–       Treasury Office

       5. Demolition Permit

5.1  Accomplished Demolition Form

5.2 Sketch Plan of Area to be

      Demolished

5.3 Update Certificate of Tax

      Payment

5.4 Permit Fee

 

–       Engineering Office

–       Owner/ Client

 

–       Office of the Assessor

 

–       Treasury Office

6.    Permit for temporary service

            connection

6.1  Accomplished Permit Form

6.2 Building Permit for new

       construction

6.3  Electrical Plan/Layout

6.4  Fire Safety Inspection

       Certificate (FSIC)

6.5  Permit Fee

 

 

 

–       Engineering Office

–       Engineering Office

 

–       Owner/ Client

–       Office of the Bureau of Fire & Protection

–       Treasury Office

 

 

       7. Sidewalk Construction Permit

7.1 Accomplished Permit Form

7.2 Sketch Plan of sidewalk to be

      constructed / repaired

7.3 Permit Fee

 

 

–       Engineering Office

–       Owner/ Client

 

–       Treasury Office

       8. Scaffolding Permit

8.1 Accomplishment Permit Form

8.2 Sketch Plan of street line to

      be occupied

8.3 Permit Fee

 

 

–       Engineering Office

–       Owner/ Client

 

–       Treasury Office

       9. Signage Permit

9.1 Accomplished Building Permit

      Form whenever there is a

      concrete/steel structure

      exceeding 3.00 meter in   

      height.

9.2 Zoning Clearance – for

      advertising signs

 

9.3 Accomplished Electrical

      Permit Form

           9.4 Connection Electrical Layout

                 signed and Sealed by PEE or   

                 assigned Municipal

                 Electrician

9.5  Accomplished signage

       Permit

9.6  Sketch Plan of signage’s to

       be installed or erected

9.7  Location/Vicinity Plan

9.8  Lot Documents whenever it

       occupies a private lot

9.9  DPWH Clearances (for

       national roads/highways)

9.10 Permit Fee

 

–       Engineering Office

 

 

 

 

–       MPDC

 

 

–       Engineering Office

 

–       Owner/ Client

 

 

 

–       Engineering Office

 

–       Owner/ Client

 

–       Owner/ Client

 

–       Owner/ Client

–       Department of Public Works & Highways

–       Treasury Office

 

CLIENT STEPS

AGENCY ACTIONS

FEES TO BE PAID

PROCESSING TIME

PERSON RESPONSIBLE

Ask for the Particular permit form and accomplish the given form

 

Gives the Forms to the Client

None

2 minutes

Draftsman-Engineering Office

 

Submit the duly accomplished application forms and attached the needed requirements.

Evaluates and assesses the submitted plans and pertinent documents for compliance for the requirements.

None

25 minutes

Draftsman-Engineering Office

 

Receives an Order of Payment stating the fees to be paid

Issues Order of Payment

None

5 minutes

Mun. Engineer or Draftsman-Engineering Office

 

Pay the corresponding fees at the Municipal Treasurer’s Office and receive the Official Receipt (OR)

 

Receives the payment and issues the Official Receipt (OR)

 

Refer to the Table of fees below

2 minutes

Admin Aide IV/ Revenue Collection Clerk III-Treasury Office

 

Submit the Official Receipt (OR)

 

Receives the Official Receipts

 

2 minutes

Mun. Engineer or Draftsman-Engineering Office

 

Processes the Plans and pertinent documents for final approval of Municipal Engineer.

 

1 hour

Mun. Engineer or Draftsman-Engineering Office

Receive the approved permit

Issues the approved permit

 

8 minutes

Draftsman-Engineering Office

y

 

1.    Electrical Fees

The following Schedule shall be used for computing electrical fees residential, institutional, commercial and industrial structures.

1.1 Total Connected Load ( kVA)

i.              5  Kva or less

–       P 200.00

ii.            Over 5 Kva to 50 Kva

–       P 200.00      + P 20.00/KVA

iii.           Over 50 KVA to 300 KVA

–       P 1,100.00   + P 10.00/KVA

iv.           Over 300 KVA to 1,500  KVA

–       P 3,600.00   + P   5.00/KVA

v.            Over 1,500 KVA to 6,000 KVA

–       P 9,600.00   + P    2.50/ KVA

vi.           Over 6,000 KVA

–       P 20,850.00 + P     1.25/KVA

 Note:  Total Connected Load as shown in the load schedule.

 

 

1.2  Total transformer/Uninterrupted Power Supply (UPS)/Generator Capacity ( Kva )

 

i.              5  KVA or less

–       P 40.00

ii.            Over 5 KVA to 50 KVA

–       P 40.00        + P   4.00/KVA

iii.           Over 50 KVA to 300 KVA

–       P 220.00      + P   2.00/KVA

iv.           Over 300 KVA to 1,500  KVA

–       P 720.00      + P   1.00/KVA

v.            Over 1,500 KVA to 6,000 KVA

–       P 9,920.00   + P   0.50/ KVA

vi.           Over 6,000 KVA

–       P 4,170.00   + P   0.25/KVA

Note: Total Transformer/UPS/Generator Capacity shall include all transformers, UPS and Generators which are owned/installed by the owner/applicant as shown in the electrical plans and specifications.

 

1.3  Pole/ Attachment Location Plan Permit

i.              Power Supply Pole Location

–       P  30.00/Pole

ii.            Guying Attachment

–       P  30.00/ attachment

Note: This applies to designs/installations within the premises

1.4 Miscellaneous Fees: Electric Meter for union separation, alteration, reconnection or relocation and issuance of Wiring Permit:

Use or Character of Occupancy

Electric Meter

Wiring Permit

i.      Residential

P 15.00

P 15.00

ii.    Commercial/Industrial

P 60.00

P 36.00

iii.   Institutional

P 30.00

P 12.00

1.5  Formula of Computation of Fees

                The total Electrical fees shall be the sum of 1.1 to 1.4 of this table.

 

2.    Mechanical Fees

1.1   Refrigerator, Air Conditioning and Mechanical Ventilation:

i.              Refrigerator (cold storage)per ton or fraction thereof

–       P 40.00

ii.            Ice Plants, per ton or fraction thereof

–       P 60.00       

iii.           Packaged/ Centralized Air Conditioning Systems up to 100 tons, per ton

–       P 90.00     

iv.           Every ton or fraction thereof above 100 tons

–       P 40.00

v.            Window Type air conditioners, per unit

–       P 60.00

vi.           Mechanical Ventilation, per Kw or fraction thereof of blower or fan , or metric equivalent

–       P 40.00

vii.          In a series of AC/REF systems located in one establishment, the total installed tons of refrigeration shall be used as the basis of computation for purposes of installation/inspection fees, and shall not be considered individually.

 

           2.2. Escalators and Moving Walks, funiculars and the like.

i.              Escalator & Moving Walk per Kw or fraction thereof

–       P      10.00

ii.            Escalator and moving walks up to 20.00 lineal meters or fraction thereof

–       P      20.00       

iii.           Every lineal  meter or fraction thereof in excess of 20.00 lineal meters

–       P      10.00     

iv.           Funicular, per KW or fraction thereof

(a) Per lineal meter travel

–       P    200.00

 

–       P      20.00

v.            Cable car, per KW or fraction thereof

(a) per lineal meter  travel

–       P      40.00

 

–       P        5.00

 2.3. Elevators, per unit

i.              Motor Driven dumbwaiters

–       P    600.00

ii.            Construction elevators for material

–       P 2,000.00

iii.           Passenger Elevators

–       P 5,000.00

iv.           Freight Elevators

–       P 5,000.00

v.            Car elevators

–       P 5,000.00

 2.4.  Boilers, per KW

i.              Up to 7.5 KW

–       P    500.00

ii.            Above 7.5 KW TO 32 KW

–       P    700.00

iii.           Above 22 KW To 52 KW

–       P    900.00

iv.           Above 37 KW to 52 KW

–       P 1,200.00

v.            Above 52 KW to  67 KW

–       P 1,400.00

vi.           Above 67 KW to  74 KW

–       P 1,600.00

vii.          Every KW or fraction thereof above 74 KW

–       P        5.00

             2.5. Pressurized water heaters, per unit

     –     P    200.00

             2.6. Water, sump and sewage pumps

                    for commercial/Industrial use, per   

                    KW or fraction thereof

–       P      60.00

             2.7. Automatic Fire sprinkler system, per

                     sprinkler head

–       P        4.00

  2.8. Diesel/ Gasoline ICE, Steam, Gas Turbine/ Engine, Hydro, Nuclear or Solar

         Generating Units and the like, per KW.

i.              Ever KW up to 50 KW

–       P       25.00

ii.            Above 50 KW up to 100 KW

–       P       20.00

iii.           Every KW Above 100 KW

–       P         3.00

             2.9. Compressed Air, Vacuum,

                    Commercial Institutional and /or

                    Industrial Gases, per outlet

–       P       20.00

            2.10. Gas Meter, per unit

      –    P    100.00

            2.11. Power piping for gas/ steam/etc., 

                     per lineal meter or fraction thereof

                     or per cu. Meter or fraction thereof                             

                     whichever is higher

–       P        4.00

  2.12. Other Internal Combustion Engines, including cranes, forklifts, loaders, pumps,

             mixers, compressors and the like, not registered with the LTO per KW:

i.              Up to 50 KW

–       P       10.00

ii.            Above 50 KW up to 100 KW

–       P       12.00

iii.           Every KW Above 100 KW

–       P         3.00

              2.13.  Pressure Vessels, per cu.meter               

                        or fraction thereof

–       P      60.00

              2.14.  Other Machinery/ Equipment for

                      commercial/ Industrial/ Institutional

                      use not elsewhere specified per                 

                      KW or fraction thereof

      –     P     60.00

              2.15. Pneumatic tubes, Conveyors,

                       Monorails for materials handling

                       and addition to existing supply

                       and/ or exhaust duct works and

                       the like, per lineal meters or

                       fraction thereof

–       P      10.00

             2.16.  Weighing Scale structure, per ton 

                       or fraction thereof

–       P       50.00

2.    Plumbing Fees

2.1   Installation Fees (1) “unit” composed of one (1) water closet, two (2) floor drains, one (1) Sink with ordinary trap, three (3) faucets and one (1) shower head. A partial part thereof shall be charged as that of the cost of a whole “UNIT”.

           3.2  Every fixture in excess of one unit:

      –    P      24.00

i.              Each water closet

–       P        7.00  

ii.            Each Floor drain

–       P        3.00

iii.           Each Sink

–       P        3.00

iv.           Each Lavatory

–       P        7.00

v.            Each Faucet

–       P        2.00

vi.           Each Shower Head

–       P        2.00

3.3.  Special Plumbing Fixtures

i.              Each slop Sink

–       P        7.00  

ii.            Each urinal

–       P        4.00

iii.           Each bath tub

–       P        7.00

iv.           Each grease trap

–       P        7.00

v.            Each garage trap

–       P        7.00

vi.           Each bidet

–       P        4.00

vii.          Each dental cuspidor

–       P        4.00

viii.         Each gas –fired water heater

–       P        4.00

ix.           Each drinking fountain

–       P        2.00

x.            Each bar or soda fountain sink

–       P        4.00

xi.           Each Laundry Sink

–       P        4.00

xii.          Each Laboratory sink

–       P        4.00

xiii.         Each fixed- type sterilizer

–       P        2.00

             3.4   Each water meter

      –    P       2.00

i.              12 to 25 Ǿ

–       P        8.00  

ii.            Above 25 mm Ǿ

–       P       10.00

             3.5    Construction of septic tank,

                       applicable in all Groups

 

i.              Up to 5.00  cu. meters of digestion chamber

–       P       24.00  

ii.            Every cu. meter or fraction thereof in excess of 5.00 cu. meter 

–       P         7.00

3.    Accessory Fees

3.1   Establishment of Line and Grade,

       all sides fronting or abutting streets,     

       esteros, rivers and creeks, first 10.00  

       meters

–       P      24.00

i.              Every meter or fraction thereof in excess of 10.00 meters

–       P        2.40

3.2     Ground Preparation and Excavation

i.              While the application for Building Permit is still being processed, the Building official may issue Ground Preparation and Excavation Permit (GP & EP) for foundation, subject to the verification, inspection and review by the line and Grade Section of the Inspection and Enforcement Division to determine compliance to line and grade, setbacks, yards/easements and parking requirements.

–       P        2.40

a.    Inspection and Verification

–       P       200.00

b.    Per cu. meter of excavation

–       P           3.00

c.    Issuance of GP & EP, valid only for thirty (30) days or superseded upon issuance of Building Permit

–       P         50.00

d.    Per u. meter of excavation

–       P           4.00

e.    Excavation other than foundation or basement, per cu. meter

–       P           3.00

f.     Encroachment of footing or foundations of building/structures to public areas as permitted, per sq. meter or fraction thereof of footing or foundation encroachment

–       P       250.00

           4.3 Fencing Fees

i.             Made of masonry, metal,    concrete up to 1.80 meters height, per lineal meter or fraction thereof

–       P          3.00 

ii.            In excess of 1.80 meters height, per lineal meter or fraction thereof

–       P          4.00

iii.           Made of indigenous materials, barbed, chicken or hog wires, per lineal meter

–       P          2.40

3.3   Construction of Pavement, up to 20.00

sq. meters

–       P         24.00

           4.4  In excess of 20% or fraction thereof of paved areas intended for commercial/ industrial/ institutional use, such as parking and sidewalks areas, gasoline station premises, skating rinks, pelota courts, tennis and basketball courts and the like

      –    P          3.00

3.4   Use of Streets and Sidewalks,

Enclosure and occupancy of Sidewalks up to 20.00 sq. meters, per calendar month

–       P       240.00

i.               Every sq. meter or fraction thereof in excess of 20.00 sq. meters    

–       P         12.00 

3.5   Erection of Scaffolding Occupying

Public Areas, per calendar month

i.              Up to 10.00 meter length

–       P       150.00

ii.            Every lineal meter fraction thereof in excess of 10.00 meters

–       P         12.00

          4.6   Sign Fees

i.              Erection and anchorage of display surface, up to 4.00 sq. meter signboard area         

–        P      120.00

 

a.    Every sq. meter or fraction thereof in excess of 4.00 sq. meters

–       P          24.00

ii.            Installation of Fees, per sq. meter or fraction thereof display surface

 

Type of Sign Display

Business Signs

Advertising Signs

Neon

P 36.00

P 52.00

Illuminated

P 24.00

P 36.00

Others

P 15.00

P 24.00

Painted -on

P   9.60

P 18. 00

 

3.6   Demolition/ Moving of Buildings/ Structures Fees, per sq. meter of area or dimensions

Involved.

i.              Buildings in all groups per sq. meter floor area

–       P     3.00

ii.            Building Systems/ Frames or portion thereof per vertical or horizontal dimensions, including fences

–       P     4.00

iii.           Structures of up to 10.00 meters in height

a.    Every meter or portion thereof in excess of 10.00 meters

–       P 800.00

 

–       P   50.00

iv.           Appendage of up to 3.00 cu. meter/unit

a.    Every cu. meter or portion thereof in excess of 3.00 cu. meters

–       P    50.00

 

–       P    50.00

v.            Moving Fee, per sq. meter of area of building /structure to be moved

–       P      3.00

Find Us

Municipal Hall, Guerrero Ave., Poblacion, San Gabriel, La Union

Contact Us

LGU: (072) 687-0125

MRDMMO: 09566515953

RHU: (072) 682-0504

Ambulance: 09213666217 / 09260685004

PNP: (072) 682-0743 / 09125411401 / 09166428592

BFP: (072) 682-0019 / 09171852711

Follow Us

© 2021. Municipality of San Gabriel, Province of La Union. All rights reserved.

Powered by:

Official Website of the Municipality of San Gabriel